Building Europe's full stack, mass scale III-V fab.

Building Europe's full stack, mass scale III-V fab.

Building Europe's full stack, mass scale III-V fab.
A yellow-lit semiconductor cleanroom with a raised technical floor and bright ceiling panels.

░░

░░

░░

░░

See the foundry

What we do

Full stack III-V Fab

One partner for III-V industrialisation. The customer-owned product definition stays connected to one process and one manufacturing data thread.

01

Design

Customer optics become a laser and waveguide layout, built for 6-inch volume production from the start.

░░

See the foundry

6-INCH DESIGN RULES

░░

See the foundry

BUILT FOR VOLUME

02

III-V epitaxy

MOCVD epitaxy grows GaAs quantum-dot and InP laser material: around 50,000 lasers per 6-inch wafer.

░░

See the foundry

MOCVD EPITAXY

░░

See the foundry

~50,000 LASERS / WAFER

03

Processing

Lithography, etching and deposition turn the grown material into laser structures across the full wafer.

░░

See the foundry

ISO CLASS 3

░░

See the foundry

WAFER-SCALE

04

Metallisation

Metal contacts are deposited so every laser on the wafer can be driven electrically.

░░

See the foundry

ELECTRICAL CONTACTS

░░

See the foundry

LOW RESISTANCE

05

Singulation

The wafer is separated into individual laser dies. Facet quality decides how cleanly each laser emits.

░░

See the foundry

ONE WAFER, THOUSANDS OF DIES

░░

See the foundry

PRECISION FACETS

06

Burn-in and test

Wafer-level test and burn-in. Known-good die, qualified for telecom and hyperscale supply chains.

░░

See the foundry

WAFER-LEVEL BURN-IN

░░

See the foundry

KNOWN-GOOD DIE

01

Design

02

III-V epitaxy

03

Processing

04

Metallisation

05

Singulation

06

Burn-in and test

01

Design

Customer optics become a laser and waveguide layout, built for 6-inch volume production from the start.

░░

See the foundry

6-INCH DESIGN RULES

░░

See the foundry

BUILT FOR VOLUME

01

Design

02

III-V epitaxy

03

Processing

04

Metallisation

05

Singulation

06

Burn-in and test

01

Design

Customer optics become a laser and waveguide layout, built for 6-inch volume production from the start.

░░

See the foundry

6-INCH DESIGN RULES

░░

See the foundry

BUILT FOR VOLUME

The curved horizon of Earth and cloud cover beneath a star-filled sky.

░░

░░

░░

The Metrics

░░

░░

░░

A yellow-lit cleanroom with a raised technical floor and rows of ceiling lights.

5,000 m²

ISO 3
cleanroom

A white cleanroom corridor with modular partitions and a raised floor.

7,000 m²

ISO 7
cleanroom

A monochrome technical floor-plan drawing of a semiconductor wafer.

19 MW

Installed,
energised

A dark site-plan illustration showing the foundry buildings and grounds from above.

45,000 m²

site,
Oudenaarde

░░

░░

░░

The Metrics

5,000 m²

ISO 3
cleanroom

19 MW

Installed,
energised

45,000 m²

site,
Oudenaarde

7,000 m²

ISO 7
cleanroom

░░

░░

░░

The Metrics

5,000 m²

ISO 3
cleanroom

19 MW

Installed,
energised

45,000 m²

site,
Oudenaarde

7,000 m²

ISO 7
cleanroom

░░

░░

░░

░░

░░

░░

░░

See the foundry

The Foundry

Inside the foundry

Forty years of manufacturing heritage. Permits, power and cleanroom already in place.

Interior views of the Thema semiconductor foundry, including cleanrooms, corridors and production equipment.
Hallway with electric machinery to the left and right
Hallway with beams set up diagonally and pipes on the right
Factory with pipes running on the left and top everywhere, with a few smaller blue pressure pumps